Bayou Pierre Responsible Mitigation Plan
The development was a wetlands mitigation bank. BWC did the hydrologic engineering to support the customer’s wetlands permitting with the U.S Army Corps of Engineers (USACE). The purpose of our report was to provide engineering support of the proposed wetland management infrastructure performance to meet minimum USACE requirements. We prepared an existing conditions hydrologic analysis […]
Bayou Pierre Responsible Mitigation Plan Read More »

